Projects

8.4MVA_12MWh UPS BESS

2024 Canada Landmark Application of Energy Storage Award project, for the unique integration and implementation of a battery energy storage system (BESS) plus uninterrupted power supply (UPS) system in Collingwood Ontario.

 

 

The core energy storage solution is a behind-the-meter system incorporating industrial-grade batteries and an uninterruptible power supply ("UPS"), improving power reliability while reducing energy costs.

 

The double conversion system which augments the system’s reliability, and the containerized form of the solution which facilitates scalability, make this application of technologies unique.

 

UPS BESS to provide solutions for large manufacturing plants and other industrial operations that wanted to improve energy quality and reduce energy costs.